Current Bids


PREQUALIFICATION IS REQUIRED FOR BOND CONSTRUCTION PROJECTS THAT ARE 1 MILLION DOLLARS OR MORE
 
 APPROVED M/E/P SUBCONTRACTORS LIST

10-12-2018 MEP SUBCONTRACTORS APPROVED LIST.pdf

All first time M/E/P Subcontractors must submit a 2018 Prequalification packet.
 Download a 2018 M/E/P Subcontractor Prequalification packet here: 
 
 
 APPROVED PRIME CONTRACTORS LIST

10-12-2018 PRIME CONTRACTORS APPROVED LIST.pdf

All first time Prime Contractors must submit a 2018 Prequalification packet.
 Download a 2018 Prime Contractor Prequalification packet here:
 
 
_________________________________________________________________________________________
 
 
______________________________________________________________________________________

BID B-01-2018-19

Title: FLEXIBLE INSTRUCTIONAL SPACE + MODERNIZATION
Location: TOYON ELEMENTARY SCHOOL 
Bid Due Date: OCTOBER 31, 2018 BEFORE 1:00PM
 
Non-Mandatory Job Walk #1: OCTOBER 11, 2018 AT 3:00PM
Non-Mandatory Job Walk #2: OCTOBER 18, 2018 AT 3;00PM
Job Walk Location: TOYON ELEMENTARY SCHOOL 995 BARD ST., SAN JOSE, CA 95127
Last Day To Submit Questions: OCTOBER 23, 2018 5:00PM
Engineer/Construction Manager: KITCHELL CEM.
Contact: MARK CASINI, MCASINI@KITCHELL.COM 408-280-7889
 
CONSTRUCTION DOCUMENTS AVAILABLE FOR DOWNLOAD HERE:
 
 
ADDENDUM DOCUMENTS FOR DOWNLOAD HERE:
 
 
This project requires registration with DIR under SB854.
Please check back here for updates and addenda.
A Measure L Bond Project.
 
Bid Legal Advertisement for download here:
 
 
Job walk sign in sheet for download:
 
 
__________________________________________________________________________________